The first limit most companies hit when adding GPU servers is not space or money but electricity. A room built for a few office racks may not have the supply, the distribution or the backup power for even one rack of GPUs.
At Timeus Lab we plan and build the power side of AI server rooms. This guide explains the steps.
How do you estimate the power an AI system needs?
Estimate power from the servers' maximum rated draw, not from average use, then add network, storage and cooling. GPU servers can run close to their maximum for long periods during heavy workloads. Count each server, add the rest of the IT equipment, and then add the power used by cooling, which depends on the cooling design and climate.
Plan for growth: if more servers will come within a few years, the supply and distribution should be ready for them.
Can the building supply enough power?
Check the capacity of the building's grid connection and main switchboard first. Upgrading a grid connection can take a long time, so it is often the critical path of the whole project. Where capacity is short, options include phasing the installation, moving to a colocation site, or limiting server power.
How is power distributed to the racks?
Power goes from the main board through the UPS to power distribution units (PDUs) in each rack. High density racks often use three-phase supply and several PDUs. Each server usually has two power supplies, which should be fed from two separate sources so that one failure does not stop it.
What UPS and backup power do you need?
The UPS protects against short interruptions and gives time either for a generator to start or for systems to shut down safely. Sizing depends on what must keep running:
| Requirement | Typical design |
|---|---|
| Safe shutdown only | UPS with minutes of runtime, automatic shutdown scripts |
| Keep running through outages | UPS plus generator with automatic transfer |
| No single point of failure | Two independent power paths to every rack |
Training jobs can often be restarted from checkpoints, while production inference services may need to keep running. The design follows the importance of each workload.
Why meter power per rack?
Metering per rack shows the real cost of AI workloads, warns before a circuit is overloaded and helps plan the next expansion. It also gives the numbers needed for on-premise vs cloud cost comparisons.
Questions
Can GPU power be limited?
Yes. GPUs can be capped at lower power, with some loss of speed. This can help fit servers into an existing supply.
Do we need a generator?
Only if services must keep running during long outages. Many companies choose UPS with safe shutdown.
Does cooling change the power plan?
Yes. Cooling equipment uses power too, and liquid cooling changes how much and where.