Production planning and scheduling with AI and optimisation

By the Timeus Lab team · · 2 min read

A camera with a ring light inspects metal parts on a conveyor

In many plants the production schedule is built by one experienced planner with a whiteboard or a spreadsheet. It works until orders multiply, a machine breaks or a rush order arrives, and the whole plan has to be rebuilt by hand. Optimisation software can rebuild it in minutes.

At Timeus Lab we build planning tools that connect to the ERP and the shop floor. This guide explains what they can and cannot do.

What does production scheduling software do?

Production scheduling software decides which job runs on which machine, in which order and when, while respecting limits such as machine capacity, staff shifts, material availability, setup times and due dates. It produces a plan that people can review, adjust and send to the floor.

Is it AI or optimisation?

Most scheduling is solved with mathematical optimisation and smart rules rather than with machine learning. Machine learning helps around it: predicting real processing times from history, forecasting demand, or estimating the chance that an order will be late. The combination gives plans that are both feasible and realistic.

Which constraints matter most?

ConstraintExample
CapacityA press can run one job at a time
Setup timesChanging colour or tool takes 40 minutes
SequenceLight colours before dark colours
StaffOnly two people can run the welding cell
MaterialsA job cannot start before its profiles arrive
Due datesInstallation is booked for Thursday

Collecting these rules with the planner is the main work of the project. Many of them are not written down anywhere.

How do planners stay in control?

Planners stay in control because the software proposes and the planner decides. A good tool shows why a job was placed where it is, lets the planner lock or move jobs, and recalculates the rest. Rush orders and breakdowns become a "what if" question with an answer in minutes.

What data does it need?

It needs orders and due dates from the ERP, routings and times, machine calendars, staff shifts and material arrival dates. Real-time status from the floor, through the shop floor data layer, lets the plan react when something changes.

Questions

Does it work for make-to-order companies?

Yes. Make-to-order plants with daily changes often gain the most. See also our guide on ERP for manufacturers.

Can it plan installation teams too?

Yes. Field teams, vehicles and appointments can be planned with the same approach as machines.

Will the planner lose their job?

No. The planner spends less time rebuilding plans and more time on decisions and exceptions.