SCADA vs MES vs ERP: what each system does and how they fit together

By the Timeus Lab team · · 2 min read

An industrial sensor on an aluminium rail next to a controller with wires

Industrial software is full of abbreviations, and the borders between them are blurry. Vendors stretch their products into neighbouring areas, and many plants end up unsure which system should own which data. A clear picture saves money and avoids duplicate work.

At Timeus Lab we build and connect every layer, from controllers to business systems. Here is how they fit.

What are the layers of plant software?

Plant software is usually described in levels, from machines to management. Each level works at a different speed and answers different questions.

LayerAnswersTime scale
PLC and controllersHow do I move this machine right now?Milliseconds
SCADA and HMIWhat is the state of the process, and are there alarms?Seconds
MESWhich order is running, with which material, and how good is it?Minutes to shifts
ERPWhat did we sell, buy, make and earn?Days to months

What does SCADA do?

SCADA (supervisory control and data acquisition) shows operators the live state of a process, raises alarms, records history and lets operators change set points. It is common in process industries, utilities and large lines. HMI panels do a similar job for a single machine.

What does an MES do?

An MES (manufacturing execution system) manages the execution of production orders on the floor: dispatching work, tracking material and batches, recording quality and downtime, and calculating performance such as OEE. It links what SCADA sees with what the ERP planned.

What does an ERP do in this picture?

The ERP owns the business side: clients, orders, purchasing, stock value, costs and invoices. It tells the MES what to make and receives back what was made, used and scrapped.

Does every plant need all four?

No. Small plants often skip a separate MES and use simple shop floor screens connected to the ERP, plus SCADA or HMI on the machines. As the plant grows, MES functions become worth a dedicated system. What matters is that each piece of data has one owner and flows automatically to the others.

How are they connected?

They are connected through standard interfaces: OPC UA and MQTT between controllers and higher systems, as described in OPC UA vs MQTT, and APIs or messages between MES and ERP. The ISA-95 standard describes the levels and the information exchanged between them and is a useful common language for projects.

Questions

Can our ERP act as an MES?

Some ERPs include basic shop floor functions, which can be enough for simple plants. For detailed tracking and machine integration, a dedicated layer is usually needed.

Which should we implement first?

Usually the layer where data is most missing. Often that is simple shop floor reporting linked to the ERP.

Can you work with our existing SCADA?

Yes. We connect existing SCADA systems to new MES and ERP functions instead of replacing them.